57 lines
1.1 KiB
Markdown
57 lines
1.1 KiB
Markdown
---
|
|
tags:
|
|
- daily
|
|
date:
|
|
"{ date }":
|
|
pomodoro:
|
|
---
|
|
## Tasks
|
|
|
|
```tasks
|
|
due today
|
|
```
|
|
|
|
### Open Tasks
|
|
```tasks
|
|
due before today
|
|
no scheduled date
|
|
is not recurring
|
|
not done
|
|
sort by priority
|
|
```
|
|
|
|
```
|
|
```
|
|
___
|
|
### New Tasks
|
|
- [ ]
|
|
## Quick Notes
|
|
Before next flight:
|
|
- [ ] Make sure LTE antenna is working, test speed
|
|
- [ ] calib swash, make sure control is working, by testing in altitude mode in hand
|
|
- [ ] fix swash prop assembly number two
|
|
- [ ] analyze log from thursday (was it a motor problem? broken esc cable)
|
|
- [ ] replace broken part in right side volume
|
|
- [ ] make sure all the needed files are available on the laptop.
|
|
- [ ] make sure batteries, remote, laptop are all charged
|
|
- [ ] flash second cm4 with image
|
|
- [ ]
|
|
# Daily Recap
|
|
## Learnings
|
|
## Planning of Tomorrow
|
|
### New Tasks for tomorrow
|
|
1. change due dates of unfinished tasks today
|
|
2. add new tasks:
|
|
- [ ]
|
|
|
|
|
|
Packen:
|
|
- [ ] Löteisen + zubehör
|
|
- [ ] Batterien + ladegerät
|
|
- [ ] mehrere raspis - getestet! LTE testen, antenne gut anmachen in PLB
|
|
- [ ] microusb kabel
|
|
- [ ] ersatz antennen
|
|
- [ ] RC geladen
|
|
- [ ] aceton
|
|
- [ ] 2 sets bits + schraubenzieher
|
|
- [ ] files auf laptop kopieren |