Hey
I've been thinking about my situation at OneSec and I want to fix an end date this week. I think the best solution is to leave as soon as possible. The reason for this being: I don't feel the same drive as before after what happened in December and you can hire 2 extra Valentins for my salary. I'm open to discuss the exact date, but I'd suggest end of January, this leaves a bit more than 3 weeks to do the following:
- finalize the battery driver code and have it reviewed by Hasan
- Review both PDBs --> this concludes a full iteration of pcbs.
- With the new wiring and propulsion harnesses arriving next week: test thoroughly then bring up propulsion system
- Handover
- document everything I can think of with loom videos and articles
Are there any other subjects you want me to tackle?