vault backup: 2026-01-08 09:49:41
Affected files: .obsidian/workspace.json 0 Journal/0 Daily/2026-01-07.md
This commit is contained in:
57
.obsidian/workspace.json
vendored
57
.obsidian/workspace.json
vendored
@@ -48,23 +48,9 @@
|
||||
"icon": "lucide-file",
|
||||
"title": "Handover Planning"
|
||||
}
|
||||
},
|
||||
{
|
||||
"id": "e698d583c3669fa3",
|
||||
"type": "leaf",
|
||||
"state": {
|
||||
"type": "markdown",
|
||||
"state": {
|
||||
"file": "0 Journal/0 Daily/2026-01-07.md",
|
||||
"mode": "source",
|
||||
"source": false
|
||||
},
|
||||
"icon": "lucide-file",
|
||||
"title": "2026-01-07"
|
||||
}
|
||||
}
|
||||
],
|
||||
"currentTab": 3
|
||||
"currentTab": 2
|
||||
}
|
||||
],
|
||||
"direction": "vertical"
|
||||
@@ -313,7 +299,46 @@
|
||||
"periodic-notes:Open today": false
|
||||
}
|
||||
},
|
||||
"active": "1d5570e10a658ca5",
|
||||
"floating": {
|
||||
"id": "9e69306eda10935d",
|
||||
"type": "floating",
|
||||
"children": [
|
||||
{
|
||||
"id": "81e4ed8c449e8482",
|
||||
"type": "window",
|
||||
"children": [
|
||||
{
|
||||
"id": "3637e3c73ab23144",
|
||||
"type": "tabs",
|
||||
"children": [
|
||||
{
|
||||
"id": "e698d583c3669fa3",
|
||||
"type": "leaf",
|
||||
"state": {
|
||||
"type": "markdown",
|
||||
"state": {
|
||||
"file": "0 Journal/0 Daily/2026-01-07.md",
|
||||
"mode": "source",
|
||||
"source": false
|
||||
},
|
||||
"icon": "lucide-file",
|
||||
"title": "2026-01-07"
|
||||
}
|
||||
}
|
||||
]
|
||||
}
|
||||
],
|
||||
"direction": "vertical",
|
||||
"x": 3480,
|
||||
"y": -883,
|
||||
"width": 1680,
|
||||
"height": 1865,
|
||||
"maximize": false,
|
||||
"zoom": 0
|
||||
}
|
||||
]
|
||||
},
|
||||
"active": "e698d583c3669fa3",
|
||||
"lastOpenFiles": [
|
||||
"99 Work/0 OneSec/OneSecNotes/Handover Planning.md",
|
||||
"0 Journal/0 Daily/2026-01-07.md",
|
||||
|
||||
@@ -27,4 +27,12 @@ ___
|
||||
___
|
||||
## Notes
|
||||
### Email Draft
|
||||
-
|
||||
Hey
|
||||
I've been thinking about my situation at OneSec and I want to fix an end date this week. I think the best solution is to leave as soon as possible. The reason for this being: I don't feel the same drive as before after what happened in December and you can hire 2 extra Valentins for my salary. I'm open to discuss the exact date, but I'd suggest end of January, this leaves a bit more than 3 weeks to do the following:
|
||||
- finalize the battery driver code and have it reviewed by Hasan
|
||||
- Review both PDBs --> this concludes a full iteration of pcbs.
|
||||
- With the new wiring and propulsion harnesses arriving next week: test thoroughly then bring up propulsion system
|
||||
- Handover
|
||||
- document everything I can think of with loom videos and articles
|
||||
|
||||
Are there any other subjects you want me to tackle?
|
||||
Reference in New Issue
Block a user