Files
Main/0 Journal/0 Daily/2025-08-11.md
Obsidian-MBPM4 fca50a6e8c vault backup: 2025-08-12 00:48:26
Affected files:
.obsidian_iphone/plugins/obsidian-spaced-repetition/data.json
.obsidian_iphone/workspace-mobile.json
0 Journal/0 Daily/2025-08-11.md
2025-08-12 00:48:26 +02:00

4.4 KiB
Raw Blame History

Alias, Tags, day_grade, Dehnen, Sport, Ernährung
Alias Tags day_grade Dehnen Sport Ernährung
daily

2025-08-11

2025-08-10 <--> 2025-08-12

Error generating daily quote


Planning


  • solder bench finished
  • dev cables sorted
  • documentation reorganized.
  • exports are running with jerry
  • vidit has a clear action plan for PCB development: QA, ordering, integration tests
  • Valentin also has a clear action plan with deliverables
  • Hasan: clear action plan: working on mission management and parameter system for the drone.

ok with regards to jerry:

  • I want to launch the export process with nature exports and with the quality check features that we have implemented so far, this also allows to test if those quality checks do what they are supposed to do.
  • and to have the export farm running again and producing exports also tests the project for what it actually needs to deliver at the end. So this is kind of an integration test. But yeah agreed with the simulator project.

Hasan:

  • Yes if you want to do that informally that works for me, but I think we should inform the entire team about the project. As an update. Its motivating and adds pressure. Meaning it pushes us to get a first version out and running.
  • Yes I agree that Hasan needs to understand the business level requirements. But I disagree that he cannot follow a clear action plan. E.g. with chirp this has worked well. He showed an inital design, we discussed it, changed the architecture and then he implemented it pretty much how we discussed it.

Valentin:

  • Sounds good. I am in the office next week as well.
  • I wanted to define clear deliverables with him and let him work towards them. Basically the way we discussed yesterday: 1. understand the project, the tooling and the theory (your briefing will complete this I think). 2. update the mujoco simulator to simulate the S-rod drone (and verify/update the models with the test stand as discussed this morning) 3. Develop the factory method based classes that control that drone in the simulator with collective and then cyclic later on. 4. Translate to real drone flight.

Reflection

ich habe heute Lange mit Dannick geredet. Ihm geht es nicht gut. Er zögert das Reden mit robyn weiter hinaus, was nicht gut ist denke ich. Er sagte dass er nichts fühlt, was ihm Angst macht. Dann hat er aber auch gesagt dass er fast hätte weinen können als er Nicole alles erzählt hatte, was für mich wieder heisst dass er fühlen kann. Heute hat er auch fast geweint (und ich auch). Er meinte ich sei empathisch und er fragte mich ob ich manchmal etwas spüre wenn andere Menschen mir etwas erzählen (Schmerzen, leid, Unruhe ). Ein bisschen sagte ich, aber nicht so fest wie andere Leute. Er hat mühe alle Gedanken und Gefühle mit Robyn zu teilen. Ich habe ihm gesagt dass ich das auch habe mit Alena, da wir ein grosses Ungleichgewicht haben. Sie erzählt alles doppelt und 3fach und ich eher zu wenig. Deswegen braucht es Strategien.

Er ist extrem hart geworden, was ihm manchmal Angst macht. Er meint das ihm alle egal sind, bis auf Robyn (vielleicht auch nicht), Familie, Julius und ich. Aber vielleicht ist er einfach so.

Vorschläge waren:

  • meditationscamp um wirklich sich mit sich selbst zu beschäftigen
  • Mit robyn reden, nicht weiter hinauszögern. Entweder geht es weiter, oder nicht. Aber das Limbowarten muss aufhören, da es nicht ohne Ziel weitergeht.

Notes