Files
Main/0 Journal/0 Daily/2025-09-02.md
Obsidian-MBPM4 4b0c54133a vault backup: 2025-09-05 11:28:13
Affected files:
.obsidian/workspace.json
0 Journal/0 Daily/2025-09-02.md
2025-09-05 11:28:13 +02:00

899 B

Alias, Tags, day_grade, Dehnen, Sport, Ernährung
Alias Tags day_grade Dehnen Sport Ernährung
daily

2025-09-02

2025-09-01 <--> 2025-09-03

Error generating daily quote


Planning

  • BUY LIST
  • USB extension cable
  • FLARM module
  • 3D printer bed for ender 3 SE

Reflection


Notes

Vidit Summary

  1. Power testing wiring harness:
    1. power supply is working in wiring harness
    2. load testing still needed
  2. spikes in IMU when battery power is connected:
    1. removing the ICs on the lower pdb (U8 & U7) resolved the issue
  3. parallel calibration
    1. TODO: review code.
  4. awesome
  5. awesome
    1. battery studio by TI tries to read the fuel gauge but we want to read the AFE first. This is the reason for the communication issues and its
    2. hardware issue:

Quality Assurance Plan

  • c++ pre commit hooks: linters, check if includes are actually used.