--- aliases: Tags: - daily nägelkauen: Dehnen: Sport: Ernährung: --- # 2025-07-08 [[2025-07-07]] <--> [[2025-07-09]] Error generating daily quote --- ## Planning ___ ## Reflection ___ ## Notes - ### Biweekly sync Vidit: - Finish the state estimator with 4 IMUs - include position estimates - plan electrical hardware for pilot project launch: - lead times, availability, assembly, testing Hasan: - chirp handler on autopilot - share mission / trajectory messages - share log data - stream important messages - update firmware of teensy (later) - hook landing - Mission planning, trajectory handling - Communication with fleet management system Ugur: - get drone to fly reliably in hover mode - world record flight - parameter and configuration system - hook landing - go into position control, first sim only then real one (dependent on state estimator by vidit) Notes - plan backwards from December: what is needed at due date. - I need to help Dannick with ground control system. > [!NOTE]- Notes > > Ich muss es ownen! Heisst ich muss mich selbst sein und meine Meinung sagen > - Ich muss auch mit Floris offen reden und ihn konfrontieren wenn mir etwas nicht passt. Dafür will ich das BiWeekly verwenden und mich auch gut dafür vorbereiten > - Dannick meinte ich müsse 500.- zurück zahlen wenn ich Dinge nicht anspreche, da wir sonst unsere Zeit verschwenden. > - Ich möchte mehr Einsicht in die Finanzen: und ich muss auch selbst Leute anstellen können. > - Offen sein, dass das Projekt mit Jerry nicht sehr gut läuft. Und dass ich das eigentlich nicht führen will. > - Lead daily standups: make sure that they never exceed 15 minutes. Maybe restructure them? Do hardware first? > - Make sure every meeting has a clear goal and an agenda > - Hiring: > - we should have a state estimator responsible person (project lead) > - control lead > - propulsion system lead (hardware, electronics, software (driver), testing ) > - QA manager of entire drone, can also be system engineer. >