vault backup: 2025-01-08 10:40:29
This commit is contained in:
30
.obsidian/workspace.json
vendored
30
.obsidian/workspace.json
vendored
@@ -99,9 +99,23 @@
|
||||
"icon": "lucide-file",
|
||||
"title": "Business Ideas"
|
||||
}
|
||||
},
|
||||
{
|
||||
"id": "099e70abcaed9195",
|
||||
"type": "leaf",
|
||||
"state": {
|
||||
"type": "markdown",
|
||||
"state": {
|
||||
"file": "Temporary/Vidit Update - 8.1.24.md",
|
||||
"mode": "source",
|
||||
"source": false
|
||||
},
|
||||
"icon": "lucide-file",
|
||||
"title": "Vidit Update - 8.1.24"
|
||||
}
|
||||
}
|
||||
],
|
||||
"currentTab": 5
|
||||
"currentTab": 6
|
||||
}
|
||||
],
|
||||
"direction": "vertical"
|
||||
@@ -484,23 +498,24 @@
|
||||
}
|
||||
],
|
||||
"direction": "vertical",
|
||||
"x": 720,
|
||||
"y": 25,
|
||||
"x": 2640,
|
||||
"y": 570,
|
||||
"width": 720,
|
||||
"height": 875,
|
||||
"height": 775,
|
||||
"maximize": false,
|
||||
"zoom": 0
|
||||
}
|
||||
]
|
||||
},
|
||||
"active": "c913626684654e11",
|
||||
"active": "099e70abcaed9195",
|
||||
"lastOpenFiles": [
|
||||
"2 Personal/Lists/Business Ideas.md",
|
||||
"Temporary/Vidit Update - 8.1.24.md",
|
||||
"5 Media/0 Books/Software Project Survival Guide by Steve McConnell.md",
|
||||
"Attachments/Pasted image 20250107121222.png",
|
||||
"Attachments/Pasted image 20250107120429.png",
|
||||
"Attachments/Pasted image 20250107114628.png",
|
||||
"Attachments/Pasted image 20250107114616.png",
|
||||
"2 Personal/Lists/Business Ideas.md",
|
||||
"5 Media/0 Books/Software Project Survival Guide by Steve McConnell.md",
|
||||
"0 Journal/0 Daily/2024-12-06.md",
|
||||
"Dashboard Canvas.canvas",
|
||||
"Attachments/Pasted image 20250107095858.png",
|
||||
@@ -531,7 +546,6 @@
|
||||
"Attachments/Pasted image 20241118143053.png",
|
||||
"Attachments/Pasted image 20241118142001.png",
|
||||
"Attachments/Pasted image 20241105160637.png",
|
||||
"Attachments/Pasted image 20241105160145.png",
|
||||
"Attachments/Gym-Rings-UK.pdf",
|
||||
"99 Work/Jobhunt/Applications",
|
||||
"99 Work/0 OneSec/OneSecNotes/30 Engineering Skills/Robotics/Sensors",
|
||||
|
||||
@@ -1,6 +0,0 @@
|
||||
.DS_Store
|
||||
.Trashes
|
||||
._*
|
||||
.stversions/**
|
||||
.git/**
|
||||
.git
|
||||
@@ -166,7 +166,52 @@ Erring on the side of too much process is marginally more expensive, versus erri
|
||||
Software projects are inherently complex and therefore need to be planned, controlled and made sure that the progress is visible, people are supported to do the project's work.
|
||||
The risks should be tracked and constantly redeveloped.
|
||||
#### Planning
|
||||
- Think about processes in the upstream period of fixing mistakes at 1/200th of the price.
|
||||
- Rule of thumb: each day spent in processes (e.g. technical review) saves 3-10 days later in the project
|
||||
- Software Development Plan
|
||||
- Project Estimates
|
||||
- Revised Estimates
|
||||
- Quality Assurance Plan
|
||||
- Staged Delivery Plan
|
||||
- Requirements Development
|
||||
- Architecture
|
||||
- Detailed Design
|
||||
|
||||
|
||||
> [!Important]+ Planning Checkpoint Review
|
||||
> Very early in the project (at about 10%) success or failure is determined. This means it can be used as a checkpoint to do a *go/no go* decision about the project. At this point the team should have produced:
|
||||
> - user interface prototype (and shown it to users)
|
||||
> - detailed requirements
|
||||
> - detailed project plan including cost and schedule estimates.
|
||||
>
|
||||
> **Mandatory Documents needed for the checkpoint**:
|
||||
> - Name of project's key decision maker
|
||||
> - Vision statement
|
||||
> - Business case for the software
|
||||
> - preliminary effort and schedule goals
|
||||
> - preliminary effort and schedule estimates
|
||||
> - top 10 risks list
|
||||
> - User interface Style Guide
|
||||
> - Detailed User interface Prototype
|
||||
> - User Manual / Requirements Specification
|
||||
> - Software Quality Assurance Plan
|
||||
> - Detailed Software Development Plan
|
||||
>
|
||||
> **Agenda for the Checkpoint Review**
|
||||
> - Is the original product concept still viable?
|
||||
> - Will it be possible to develop a product that matches the project's vision statement?
|
||||
> - Is the business case for the software still justified when updated, more accurate cost and schedule estimates are considered?
|
||||
> - Can the major risks to the project be surmounted?
|
||||
> - Have users and developers been able to agree on a detailed User Interface Prototype?
|
||||
> - Is the User Manual / Requirements Specification complete and stable enough to support further development work?
|
||||
> - Is the Software Development Plan complete and adequate to support further development work?
|
||||
> - What is the estimated cost of completing the project
|
||||
> - What is the estimated schedule for completing the project?
|
||||
|
||||
Benefits of splitting development into these two funding phases:
|
||||
1. Cancelling one bad project at the stage of 10-20% can fund many other projects
|
||||
2. More reliable funding for the bulk of the project, because it can be better estimated
|
||||
3. Forces project manager to do upstream work in the first 10-20% --> setting the project up for success.
|
||||
#### Risk Management
|
||||
|
||||
#### Project Control
|
||||
|
||||