vault backup: 2025-06-23 16:18:24
Affected files: .obsidian/plugins/text-extractor/cache/ce6b78b9af74a07dd57970ff5d18ef43.json .obsidian/workspace.json 0 Journal/Meetings/17.06.2025 - Pilot Kickoff Planning.md Attachments/Pasted image 20250623154221.png
This commit is contained in:
1
.obsidian/plugins/text-extractor/cache/ce6b78b9af74a07dd57970ff5d18ef43.json
vendored
Normal file
1
.obsidian/plugins/text-extractor/cache/ce6b78b9af74a07dd57970ff5d18ef43.json
vendored
Normal file
@@ -0,0 +1 @@
|
|||||||
|
{"path":"Attachments/Pasted image 20250623154221.png","text":"? = obilearts Q x | I - 2 \\'m . l ! :1‘ ! ‘ eÇ‘SÏare X 75x | E— ‘ ds *. Q : | i , l: | Ï Spreitenbach, Aargau ‘ i @ coogle street View ‘r ! f ; A BULEILE - { | | - ° Ll | | ; wFFs r | | r ‘ ’///.014, ‘ ï r . I N GE K | | . v - — ‘ I . \\&‘ g % % \"“'m“ L æ L","libVersion":"0.3.2","langs":"deu+eng+fra"}
|
||||||
2
.obsidian/workspace.json
vendored
2
.obsidian/workspace.json
vendored
@@ -301,6 +301,7 @@
|
|||||||
},
|
},
|
||||||
"active": "84f0fd68d3885e08",
|
"active": "84f0fd68d3885e08",
|
||||||
"lastOpenFiles": [
|
"lastOpenFiles": [
|
||||||
|
"Attachments/Pasted image 20250623154221.png",
|
||||||
"Temporary/Untitled 8.md",
|
"Temporary/Untitled 8.md",
|
||||||
"0 Journal/Meetings/17.06.2025 - Pilot Kickoff Planning.md",
|
"0 Journal/Meetings/17.06.2025 - Pilot Kickoff Planning.md",
|
||||||
"99 Work/0 OneSec/OneSecNotes/30 Engineering Skills/Robotics/Kalman Filter.md",
|
"99 Work/0 OneSec/OneSecNotes/30 Engineering Skills/Robotics/Kalman Filter.md",
|
||||||
@@ -346,7 +347,6 @@
|
|||||||
"3 Knowledge/4 Politics",
|
"3 Knowledge/4 Politics",
|
||||||
"2 Personal/Lists/Packlisten/Packliste - Skihochtour.md",
|
"2 Personal/Lists/Packlisten/Packliste - Skihochtour.md",
|
||||||
"2 Personal/Lists/Packlisten/Packliste - Berge Mehrtages.md",
|
"2 Personal/Lists/Packlisten/Packliste - Berge Mehrtages.md",
|
||||||
"2 Personal/Hobbies/Berge/Gletscherkurs/Gletscherkurs - Selbstudie.md",
|
|
||||||
"99 Work/0 OneSec/OneSecNotes/30 Engineering Skills/Computer Science/Untitled.canvas",
|
"99 Work/0 OneSec/OneSecNotes/30 Engineering Skills/Computer Science/Untitled.canvas",
|
||||||
"Dashboard Canvas.canvas",
|
"Dashboard Canvas.canvas",
|
||||||
"8 Work/OneSecNotes/Temporary/Untitled.canvas"
|
"8 Work/OneSecNotes/Temporary/Untitled.canvas"
|
||||||
|
|||||||
@@ -22,7 +22,7 @@ status: not_started
|
|||||||
### Points to Discuss
|
### Points to Discuss
|
||||||
- last week showed many problems
|
- last week showed many problems
|
||||||
#### Problems
|
#### Problems
|
||||||
- we have so many pcbs that are not well tested --> we don't even know what is happening. Every Pcb we make should be onboarded --> user manual, way of logging its sensors continuously (ideally fully integrated, less ideal with a teensy, instructions and a serial port)
|
- we have so many pcbs that are not well tested --> we don't even know what is happening. Every P we make should be onboarded --> user manual, way of logging its sensors continuously (ideally fully integrated, less ideal with a teensy, instructions and a serial port)
|
||||||
- we build everything from scratch --> takes a lot of time, a lot of tooling is missing. visualization tools, etc.
|
- we build everything from scratch --> takes a lot of time, a lot of tooling is missing. visualization tools, etc.
|
||||||
-
|
-
|
||||||
|
|
||||||
@@ -33,7 +33,6 @@ December:
|
|||||||
Pilot Project Start
|
Pilot Project Start
|
||||||
-
|
-
|
||||||
|
|
||||||
|
|
||||||
### Agenda
|
### Agenda
|
||||||
1. Quick Overview of Scope, Timeline and goals
|
1. Quick Overview of Scope, Timeline and goals
|
||||||
2. Detailed definition of scope
|
2. Detailed definition of scope
|
||||||
@@ -43,3 +42,40 @@ Pilot Project Start
|
|||||||
2. For each area: final requirements, intermediary milestones,
|
2. For each area: final requirements, intermediary milestones,
|
||||||
## Meeting Minutes
|
## Meeting Minutes
|
||||||
|
|
||||||
|
Vertrag abgeschlossen
|
||||||
|
|
||||||
|
Ziel: Launch im Dezember.
|
||||||
|
|
||||||
|
|
||||||
|
Hasan: waypoint mission and hooklanding.
|
||||||
|
Valentin: focus on reliability and VTOL full flight envelope.
|
||||||
|
|
||||||
|
### Definition of Pilot Project
|
||||||
|
|
||||||
|
#### Mobile Parts
|
||||||
|
- second story with windows that can be opened and contain a second smaller glass (1), which acts as a fall guard for people.
|
||||||
|
- if crash, drone falls onto cars / people. (2)
|
||||||
|
|
||||||
|
![[Pasted image 20250623154221.png]]
|
||||||
|
|
||||||
|
|
||||||
|
#### JTL Extension
|
||||||
|
- Both customers (mobile parts and tobacco shop in schwyz) use [JTL](https://www.jtl-software.de/) as their e-commerce platform.
|
||||||
|
- We can build a JTL extension (OneSec Drone Delivery) which integrates with their website.
|
||||||
|
- We get information of new orders.
|
||||||
|
- we know where the drone needs to fly.
|
||||||
|
- Involve Hasan in JTL extension dev: interfaces need to work together with the autopilot.
|
||||||
|
- Fleet management (can be primitive) or off the shelf (OTS).
|
||||||
|
-
|
||||||
|
|
||||||
|
#### Example Delivery to Wohlen Downtown
|
||||||
|
- ~11km, roughly 500m over populated area.
|
||||||
|
- Transition always over forest / fields
|
||||||
|
|
||||||
|
#### VTOL
|
||||||
|
- Enough testing in all different conditions.
|
||||||
|
- we need to be confident that it works.
|
||||||
|
|
||||||
|
|
||||||
|
#### Alternatives if Problems
|
||||||
|
- if no VTOL: charging infrastructure needed at customers
|
||||||
BIN
Attachments/Pasted image 20250623154221.png
Normal file
BIN
Attachments/Pasted image 20250623154221.png
Normal file
Binary file not shown.
|
After Width: | Height: | Size: 4.8 MiB |
Reference in New Issue
Block a user